1 EPCC OF NGDS TO NIBONG TEBAL FL1 DL1, NIBONG TEBAL, PENANG ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 12 STEEL PIPE LINE CONSTRUCTION OF ODORIZER BUILDING AND ODORIZER SYSTEM - 32 KM 4,800,000.00 MASMIRIN CORPORATION SDN BHD / GAS MALAYSIA SDN BHD 2004/2005
2 EPCC OF NGDS TO PRAI FL DL STAGE 1/03, PRAI IND. AREA, PENANG ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 12 STEEL PIPES - 8KM 3,200,000.00 MASMIRIN CORPORATION SDN BHD / GAS MALAYSIA SDN BHD 2005
3 EPCC OF NGDS TO PRAI FL DL (LOOPING) STAGE 1/03, PRAI INDUSTRIAL AREA, PENANG ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 STEEL PIPES - 4.5KM 2,800,000.00 MASMIRIN CORPORATION SDN BHD / GAS MALAYSIA SDN BHD 2005
4 EPCC OF THE NGDS TO TAMAN MAKMUR FL STAGE 1/08, KULIM, KEDAH DARUL AMAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 STEEL PIPES - 4KM 1,200,000.00 GAS MALAYSIA BERHAD 2009
5 EPCC OF THE NGDS TO SUNGAI PETANI FL STAGE 1/09, SUNGAI PETANI, KEDAH DARUL AMAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 STEEL PIPES - 0.4KM 145,000.00 GAS MALAYSIA BERHAD 2009
6 EPCC OF THE NGDS TO KUNDANG FL STAGE 1/10, KUNDANG INDUSTRIAL AREA, RAWANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 STEEL PIPES - 0.7KM 418,455.00 GAS MALAYSIA BERHAD 2009
7 EPCC OF GPRW AT PUTRA INTERCHANGE, PUTRAJAYA ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 16 STEEL PIPES - 720M 1,111,000.00 GAS MALAYSIA BERHAD 2009
8 EPCC OF GPRW AT CADANGAN MEMBINA JLN PINTAS DARI SENGKANG (J104) KE FELDA INAS BANDAR TENGGARA, JALAN JOHOR BAHRU-AIR HITAM, KULAI, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 4 STEEL PIPES- 230M 600,000.00 GAS MALAYSIA BERHAD Aug 2009 to Jan 2010
9 EPCC OF THE NGDS TO TEBRAU FL STAGE 1/10, TEBRAU, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6, NPS 4 STEEL PIPES- 226M 695,000.00 GAS MALAYSIA BERHAD Dec 2009 to June 2010
10 EPCC OF THE NGDS TO PANDAMAR FL STAGE 1/10, PANDAMAR, KLANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6, NPS 4 STEEL PIPES- 1416M 595,000.00 GAS MALAYSIA BERHAD Dec 2009 to Oct 2010
11 EPCC OF THE NGDS TO GAMBANG FL STAGE 1/10, GAMBANG, PAHANG DARUL MAKMUR ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6, NPS 4 STEEL PIPES - 2292M 865,500.00 GAS MALAYSIA BERHAD 2010
12 THE EPCC OF NGDS TO STX PRECISION SDN BHD IN NIBONG TEBAL, PULAU PINANG INCLUSIVE OF THE STATION CIVIL WORK ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF 63MM PE SERVICE LINE. - 600M 88,000.00 GAS MALAYSIA BERHAD March 2010 to June 2010
13 EPCC OF THE NGDS TO PRAI DL STAGE 1/10, PRAI, PULAU PINANG ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF 125MM AND 63MM PE PIPES. - 500M 202,610.00 GAS MALAYSIA BERHAD April 2010 to August 2010
14 EPCC AND COMMISSIONING OF THE NGDS TO CHENG FL STAGE 1/10, CHENG INDUSTRIAL AREA, MELAKA ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES - 200M 83,000.00 GAS MALAYSIA BERHAD April 2010 to July 2010
15 EPCC OF THE NGDS TO KAMUNTING FL STAGE 3/10, KAMUNTING, PERAK DARUL RIDZUAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 & NPS 4 STEEL PIPES - 300M 169,873.00 GAS MALAYSIA BERHAD June 2010 to October 2010
16 EPCC OF NGDS TO LATEXX, PLANT 1 IN KAMUNTING, PERAK DARUL RIDZUAN INCLUSIVE OF STATION CIVIL WORKS ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL SERVICE LINE - 600M 94,923.00 GAS MALAYSIA BERHAD April 2010 to July 2010
17 EPCC OF THE NGDS TO SHAH ALAM DL STAGE 1/10, SHAH ALAM, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF PE 125MM - 25M 281,500.00 GAS MALAYSIA BERHAD 2010
18 EPCC OF THE NGDS TO GEBENG FL STAGE 1/10, GEBENG INDUSTRIAL AREA, PAHANG DARUL MAKMUR ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL SERVICE LINE - 2904M 1,085,000.00 GAS MALAYSIA BERHAD June 2010 to March 2011
19 EPCC OF THE NGDS TO SHAH ALAM FL DL STAGE 1/10, SHAH ALAM, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL SERVICE LINE - 540M 445,000.00 GAS MALAYSIA BERHAD June 2010 to Oct 2011
20 EPCC OF THE NGDS TO NORTH PORT DL STAGE 1/10, NORTH PORT, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF PE 125MM, PE 90MM AND PE 63MM - 300M 195,000.00 GAS MALAYSIA BERHAD 2010
21 EPCC OF THE NGDS TO PUTRAJAYA FL STAGE 1/10, PRECINCT 18, PUTRAJAYA ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL SERVICE LINE - 60M 59,500.00 GAS MALAYSIA BERHAD 2010
22 EPCC OF THE NGDS TO SERI KEMBANGAN FL STAGE 2/10, SERI KEMBANGAN, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES - 3800M 1,038,364.25 GAS MALAYSIA BERHAD August 2010 toFebruary 2011
23 EPCC OF THE NGDS TO NIBONG TEBAL FL STAGE 1/10, NIBONG TEBAL, PULAU PINANG ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES - 800M 130,280.00 GAS MALAYSIA BERHAD September 2010 toJanuary 2011
24 EPCC OF THE GPRW AT KERJA-KERJA MENGGANTIKAN JAMBATAN DI LALUAN A125, JALAN AYER TAWAR-SIMPANG LIMA, DAERAH MANJUNG, PERAK DARUL RIDZUAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 12 STEEL PIPES WITH 2 NOS HOT TAPPING STOPPLE OF 12" X 12" - 200M 454,410.00 GAS MALAYSIA BERHAD 2010
25 EPCC OF THE NGDS TO KUALA KETIL FL STAGE 1/10, KUALA KETIL, KEDAH DARUL AMAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES - 1100M 495,000.00 GAS MALAYSIA BERHAD Dec 2010
26 GENTING PURA KENCANA, BATU PAHAT PROPOSED STREET LIGHTING INSTALLATION FOR PHASE 1A AND PHASE 1B CIVIL AND FIBER PULLING 381,820.00 KOMASI COMMUNICATIONS SDN BHD / GPROPERTY CONSTRUCTION SDN. BHD. 2010
27 GENTING INDAHPURA, KULAI PROPOSED STREET LIGHTING INSTALLATION FOR 82 UNIT SEMI-DETACHED HOUSE, PACKAGE 3A AT ZONE 33 CIVIL AND FIBER PULLING 106,070.00 KOMASI COMMUNICATIONS SDN BHD / GPROPERTY CONSTRUCTION SDN. BHD. 2010
28 INFRA-DIGI AT PARIT RAJA INDUSTRIAL PARK, BATU PAHAT CIVIL AND FIBER PULLING 2,116,161.80 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2010
29 PROPOSED OSP CIVIL TO DIGI CABIN AT BANDAR PUTRA, SEGAMAT JOHOR CIVIL AND FIBER PULLING 1,67,059.45 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2010
30 FIBER PULLING TO DIGI AT SEGAMAT, JOHOR CIVIL AND FIBER PULLING 151,786.02 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2010
31 INFRA & FIBER PULL -(DIGI MSC PRO KEPONG IND PARK) CIVIL AND FIBER PULLING 491,298.19 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2010
32 INFRA & FIBER - DIGI CABIN AT MIMALAND TO MH AT UIA GOMBAK (1 ROUTE) CIVIL AND FIBER PULLING 581,327.20 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2010
33 INFRA-PROPOSED OSP CIVIL TO DIGI CABIN AT GEMERAH, SEGAMAT, JOHOR CIVIL AND FIBER PULLING 131,729.24 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2010
34 FIBER PULLING (IB 48C)- DIGI PROJECT AT MIMALAND (ROUTE 2) CIVIL AND FIBER PULLING 1,072,413.02 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2010
35 ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE 1–CONSTRUCTION AND COMPLETION OF FIBER OPTIC CABLES RELOCATION WORK (ENGINEERING SERVICES) SECTION 7 (CH482.410-CH486.070 & CH488.450-CH490.300) CIVIL AND FIBER PULLING 209,960.00 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2010
36 ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE 2–CONSTRUCTION AND COMPLETION OF FIBER OPTIC CABLES RELOCATION WORK (ENGINEERING SERVICES) SECTION 2A (CH500.775-CH504.141 & CH505.150- CH506.990) CIVIL AND FIBER PULLING 210,478.10 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2010
37 ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE 2–HORIZONTAL DIRECT DRILLING (HDD) INSTALLATION WORKS SECTION 2A(CH500.775-CH504.141 & CH505.150-CH506.990) CIVIL AND FIBER PULLING 513,916.00 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2010
38 PERLAKSANAAN PROJEK RANGKAIAN TEMPATAN TELEKOM MALAYSIA BERHAD SECARA JADUAL KADAR HARGA CIVIL AND FIBER PULLING 10,000,000.00 KOMASI COMMUNICATIONS SDN BHD / TM BERHAD 2010
39 SUPPLY & INSTALL OF 7 WAY 100MM DIA HDPE DUCTING BY HDD METHOD AND TELEPHONE MANHOLE AND DUCTING FOR CADANGAN PEMBANGUNAN KAMPUS BARU UNIVERSITI KUALA LUMPUR (UNIKL) CAWANGAN JOHOR DI PASIR GUDANG, JOHOR CIVIL AND FIBER PULLING 245,310.00 KOMASI COMMUNICATIONS SDN BHD / TRC SDN. BHD. 2010
40 PERLAKSANAAN PROJEK RANGKAIAN TEMPATAN TELEKOM MALAYSIA BERHAD SECARA JADUAL KADAR HARGA CIVIL AND FIBER PULLING 5,000,000.00 KOMASI COMMUNICATIONS SDN BHD / TM BERHAD 2010
41 RELOCATION OF FIBER OPTIC CABLE AT SEREMBAN – TABOH NANING BETWEEN KP119.000 – KP 121.000 CIVIL AND FIBER PULLING 205,089.72 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2010
42 ELECTRIFIED DOUBLE TRACK PROJECT - SEREMBAN TO GEMAS PACKAGE 1–HORIZONTAL DIRECT DRILLING (HDD) INSTALLATION WORKS–ADDITIONAL NO 7 ELECTRIFIED DOUBLE TRACK 244,140.40 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2010
43 PROPOSED STREET LISTING INSTALLATION FOR 82 UNITS SEMI-DETACHED HOUSES, PACKAGE 3A AT ZONE 33. STREET LISTING INSTALLATION 106,070.00 KOMASI COMMUNICATIONS SDN BHD / GPROPERTY CONSTRUCTION SDN. BHD. 2010
44 PROPOSED ELECTRICAL LV INFRASTRUCTURE WORKS AT ZONE 33A PACKAGE 3A FOR SEMI-DETACHED HOUSES ELECTRICAL LV INFRASTRUCTURE WORKS 219,912.00 KOMASI COMMUNICATIONS SDN BHD / GPROPERTY CONSTRUCTION SDN. BHD. 2010
45 PROPOSED STREET LIGHTING INSTALLATION FOR PHASE 1A AND PHASE 1B STREET LIGHTING INSTALLATION 38,180.00 KOMASI COMMUNICATIONS SDN BHD / ALD CONSTRUCTION 2010
46 DIVING SERVICES TO CONDUCT UNDERWATER INSPECTION OF ANODES AND PIPELINE AT WEST MOORING DOLPHIN, JIMAH POWER PLANT, PORT DICKSON, NEGERI SEMBILAN DARUL KHUSUS MARINE & SALVAGE WORKS 177,000.00 MACH 3 ENGINEERING CONSULTANTS SDN BHD/EXCALIBER RESOURCES SDN BHD March 2011
47 TO REPAIR ANODES FEEDER CABLE AT JIMAH POWER PLANT PORT DICKSON, NEGERI SEMBILAN DARUL KHUSUS MARINE & SALVAGE WORKS 160,000.00 MACH 3 ENGINEERING CONSULTANTS SDN BHD/EXCALIBER RESOURCES SDN BHD March 2011
48 TO PROVIDE MANPOWER (DIVERS) AT TURKMENISTAN CABLE LAYING PROJECT MARINE & SALVAGE WORKS 550,000.00 IFACTORS SDN BHD/EXCALIBER RESOURCES SDN BHD April 2011 to May 2011
49 TO CONDUCT UNDERWATER SURVEY, HACKING, REPAIR RE-BAR, INSTALL FOAM WORK AND GROUTING AT INNER JETTY SHELL BAGAN LUAR, BUTTERWORTH, PENANG MARINE & SALVAGE WORKS 160,000.00 RNC TECHNOLOGY (M) SDN BHD/EXCALIBER RESOURCES SDN BHD May 2011
50 TO REPAIR ANODES FEEDER CABLE AT JIMAH POWER PLANT PORT DICKSON, NEGERI SEMBILAN DARUL KHUSUS MARINE & SALVAGE WORKS 230,000.00 MACH 3 ENGINEERING CONSULTANTS SDN BHD/EXCALIBER RESOURCES SDN BHD August 2011
51 EPCC OF THE NGDS TO SITIAWAN, FL STAGE 1/11, SITIAWAN, PERAK DARUL RIDZUAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 STEEL PIPES 249,400.00 GAS MALAYSIA BERHAD 2011
52 EPCC OF THE NGDS TO MERU FL STAGE 1/11, MERU, KLANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES 530,000.00 GAS MALAYSIA BERHAD 2011
53 SUPPLY MATERIALS, MANPOWERS WITH NECESSARY HANDLING TOOLS & EQUIPMENT FOR INSTALLATION, TESTING AND COMMISSIONING OF NATURAL GAS PIPELINE WORK FOR BAHRU STAINLESS PROJECT, TANJUNG LANGSAT, JOHOR PIPELINE TESTING AND COMMISSIONING 1,070,000.00 TRACTOR-LINE INDUSTRIES SDN BHD 2011
54 EPCC OF THE NGDS TO SENAWANG FL STAGE 1/10, SENAWANG, NEGERI SEMBILAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -24M 175,000.00 GAS MALAYSIA BERHAD 2011
55 EPCC OF THE NGDS TO AYER HITAM FL STAGE 1/11, AYER HITAM, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES - 144M 235,000.00 GAS MALAYSIA BERHAD 2011
56 HERCULES PROJECT: FTK MAN CIVIL & FIBER INFRASTRUCTURE AT SACC SHAH ALAM CIVIL AND FIBER PULLING 2,875,146.74 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2011
57 SUPPLY AND ENGINEERING WORKS FOR MAXIS PROJECT ~ RAILWAY CROSSING AT ALOR SETAR, KUBANG SEMANG, MAMBANG DIAWAN, TANJUNG MALIM, KUALA KUBU BARU, KEPONG CENTRAL AND KAJANG CIVIL AND FIBER PULLING 748,102.30 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2011
58 RELOCATION FOR NETWORK JALAN MUTIARA RINI – GELANG PATAH CIVIL AND FIBER PULLING 213,000.00 KOMASI COMMUNICATIONS SDN BHD / CELCOM (M) BERHAD 2011
59 THE SUPPLY AND PROVISION OF UNDERGROUND INFRASTRUCTURE, 48 CORES OPTICAL FIBRE CABLE AND ACCESSORIES FROM TNBD SEREMBAN TO KILAT FOR TELEKOM MALAYSIA REQUIREMENT CIVIL AND FIBER PULLING 433,645.50 KOMASI COMMUNICATIONS SDN BHD / FIBRECOMM NETWORK (M) SDN BHD 2011
60 MAXIS NGBB PROJECT SAUJANA VILLA- CIVIL WORK CIVIL AND FIBER PULLING 280,341.87 KOMASI COMMUNICATIONS SDN BHD / HUAWEI TECHNOLOGIES (M) SDN BHD 2011
61 MAXIS NGBB PROJECT HP DESIGN (JY33) CIVIL AND FIBER PULLING 130,328.04 KOMASI COMMUNICATIONS SDN BHD / HUAWEI TECHNOLOGIES (M) SDN BHD 2011
62 CIVIL WORK (HDD) (DSH2 FDC1) CIVIL AND HORIZONTAL DIRECTIONAL DRILLING (HDD) 324,296.95 KOMASI COMMUNICATIONS SDN BHD / HUAWEI TECHNOLOGIES (M) SDN BHD 2011
63 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC6 - MICROTRENCHING CIVIL AND FIBER PULLING 208,981.34 KOMASI COMMUNICATIONS SDN BHD / HUAWEI TECHNOLOGIES (M) SDN BHD 2011
64 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC6 - MICROTRENCHING CIVIL AND FIBER PULLING 216,343.13 KOMASI COMMUNICATIONS SDN BHD / HUAWEI TECHNOLOGIES (M) SDN BHD 2011
65 CIVIL WORK (BANGSAR PERMAI) CIVIL WORK 213,441.86 KOMASI COMMUNICATIONS SDN BHD / HUAWEI TECHNOLOGIES (M) SDN BHD 2011
66 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC9 (DSH1 FDC9) CIVIL AND FIBER PULLING 303,446.00 KOMASI COMMUNICATIONS SDN BHD / HUAWEI TECHNOLOGIES (M) SDN BHD 2011
67 SUPPLY, INSTALL, COMMUNICATION OF CIVIL INFRASTRUCTURE AND FIBRE OPTIC CABLE WORKS FOR EASTERN AND SOUTHERN REGIONS CIVIL AND FIBER PULLING 440,205.00 KOMASI COMMUNICATIONS SDN BHD / CELCOM (M) BERHAD 2011
68 SUPPLY AND ENGINEERING WORKS FOR LINE MAXIS TP TANAH MERAH, PASIR MAS, MENTAKAB, WAKAF BARU, GUA MUSANG AND KUALA KRAI CIVIL AND FIBER PULLING 526,961.00 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2011
69 ENGINEERING WORKS FROM MAXIS TOWER TO ML409 AYER TAWAR , PERAK CIVIL AND FIBER PULLING 950,758.39 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2011
70 EPCC OF THE NGDS TO PLENTONG FL STAGE 1/11, PLENTONG, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES - 60M 225,000.00 GAS MALAYSIA BERHAD March 2011 to Sept 2012
71 EPCC OF THE NGDS TO BANTING FL STAGE 1/11, BANTING,OLAK LEMPIT, BANTING, SELANGOR ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 STEEL PIPES - 1512M 4,745,000.00 GAS MALAYSIA BERHAD June 2011 to April 2012
72 EPCC OF THE NGDS TO PADANG TERAP FL STAGE 1/11 & 2/11, PADANG TERAP, KEDAH DARUL AMAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 STEEL PIPES AND CONSTRUCTION OF ODORIZER BUILDING AND ODORIZER SYSTEM - 17000M 6,887,783.00 GAS MALAYSIA BERHAD 2011 to 2012
73 TO INSTALL CP ANODES (410 UNIT) BY UNDERWATER WELDING METHOD AT LOADING JETTY TG. BIN POWER PLANT, KUKUP, PONTIAN, JOHOR DARUL TAKZIM MARINE & SALVAGE WORKS 350,000.00 SBN INDUSTRIES SDN BHD/EXCALIBER RESOURCES SDN BHD March 2012 to April 2012
74 DIVING SERVICES FOR DECOMMISIONING WORK OF PCSB AT SM-4 AND SM-V PLATFORM, LABUAN FT MARINE & SALVAGE WORKS 980,000.00 IEV ENGINEERING SDN BHD/EXCALIBER RESOURCES SDN BHD April 2012 to May 2012
75 DIVING SERVICES AT FERRY TERMINAL, PRAI, PENANG MARINE & SALVAGE WORKS 215,000.00 DSTS SDN BHD/EXCALIBER RESOURCES SDN BHD September 2012 toOctober 2012
76 UNDERWATER INSPECTION AND REPAIR (WELDING & JACKETING) OF JETTY PILES AT KARAMUNTING BULK OIL TERMINAL, SANDAKAN, SABAH MARINE & SALVAGE WORKS 320,000.00 RNC TECHNOLOGY (M) SDN BHD/EXCALIBER RESOURCES SDN BHD November 2012 toDecember 2012
77 EPCC OF THE NGDS TO KAPAR FL STAGE 1/12, (REINFORCEMENT), KAPAR, SELANGOR ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 STEEL PIPES - 36M 990,060.00 GAS MALAYSIA BERHAD 2012
78 EPCC OF THE NGDS TO NILAI FL STAGE 1/12, NILAI, NEGERI SEMBILAN DARUL KHUSUS ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES - 240M 284,795.00 GAS MALAYSIA BERHAD 2012
79 MENSA : KELANA BREM TOWER 1 (KEB1B) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 22,000.00 TIME DOT COM BERHAD 2012
80 MENSA : KELANA BREM 2 (KEBTB) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 22,000.00 TIME DOT COM BERHAD 2012
81 HTK CARINA COVERAGE (GPON): DAMANSARA UPTOWN 3 (DUPBB) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 22,000.00 TIME DOT COM BERHAD 2012
82 SO-12F FIBER PULLING FROM TDC M/H W-18-01-03 TO CKHBW RISER LEVEL 5 (UOB KL) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 3,942.20 TIME DOT COM BERHAD 2012
83 SO-48F FIBER PULLING FROM BMPTW (MDF) TO CKHBW RISER LEVEL 5 (MUAMALAT) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 19,398.26 TIME DOT COM BERHAD 2012
84 MENSA : FTK FOR MENSA WISMA GOOD YEAR ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 22,000.00 TIME DOT COM BERHAD 2012
85 SO : 48 FIBER PULLING & SPLICING FROM BANK RAKYAT SERVER ROOM TO MANHOLE W-12-00-01 CIVIL AND FIBER PULLING 9,795.71 TIME DOT COM BERHAD 2012
86 CARINA : FTK FOR DAMANSARA UPTOWN 1 ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 22,000.00 TIME DOT COM BERHAD 2012
87 CARINA : FTK FOR DAMANSARA UPTOWN 2 ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 22,000.00 TIME DOT COM BERHAD 2012
88 FTK - CARINA COVERAGE (GPON) : FIBER PULLING AT DAMANSARA UPTOWN 5 (DAUPB) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 22,000.00 TIME DOT COM BERHAD 2012
89 FTK WORK - JALAN DAMANSARA - JALAN 19/13 ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 84,126.18 TIME DOT COM BERHAD 2012
90 REPAIR DUCT - S/O BGN BANK RAKYAT ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 11,000.00 TIME DOT COM BERHAD 2012
91 FIBER PULLING 48F FROM ROCHE TO MH B19-00-06 ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 4,229.06 TIME DOT COM BERHAD 2012
92 COVERAGE : OVERTIME CHARGERS AND CABLE TRAY FOR UPTOWN 5 ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 25,185.56 TIME DOT COM BERHAD 2012
93 NETWORK UPGRADE : VIRGO - FIBER 48F FOR ROYAL DOMAIN (RDSPW) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 19,165.06 TIME DOT COM BERHAD 2012
94 NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT KIARA DAMAI (MKDCW) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 6,287.96 TIME DOT COM BERHAD 2012
95 NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT KIARA ASTANA, CROWN(MKCTW) & TIARA (MKTTW) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 8,594.84 TIME DOT COM BERHAD 2012
96 NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT KIARA AMAN (MKACW) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 6,287.96 TIME DOT COM BERHAD 2012
97 TRANSFORMER ADSL TO GPON : VISTA COM B. - PULLING AND TERMINATION ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 27,531.38 TIME DOT COM BERHAD 2012
98 SUPPLY AND ENGINEERING WORKS FOR SITES SG PETANI (TWSW), PADANG SERAI (PSERFH), JERANTUT (JERA) AND LAHAT (JTSK) ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 448,155.93 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2012
99 RELOCATION OF UTILITIES TELEKOM & TNB WORKS (PROJECT MEMBINA JALAN LINGKARAN TENGAH SEREMBAN, NEGERI SEMBILAN - FASA 2B ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 689,440.00 KOMASI COMMUNICATIONS SDN BHD / KONSORTIUM TEMOKIN VILLA JELAS JV SDN BHD 2012
100 (OSP) 48F FIBER PULLING FROM KLANG PROTECH TO RINGCUT EXTS TIME MANHOLE (B-50-01-83) (96C MAN GLMRB- I-CITY) & SO-(OSP)48F FIBER PULLING FROM KLANG PROTECH INTAN MELLINIUM MDF ROOM CIVIL AND FIBER PULLING 371,406.88 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2012
101 ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN SEREMBAN TO GEMAS PACK 1- SEREMBAN TO TABOH NANING. (CH464.00-CH466.275) ELECTRIFIED DOUBLE TRACK 117,678.80 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2012
102 MICRO TRENCHING AND 12C ABF FIBER OPTIC WORKS FROM HP TOWER TO MENARA SHELL, BUKIT DAMANSARA. CIVIL AND FIBER PULLING 161,878.84 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2012
103 THE SUPPLY AND PROVISION OF ENGINEERING SERVICES FOR CIVIL INFRASTRUCTURE, OPTICAL FIBRE CABLE AND ACCESSORIES FROM STULANG DARAT TO MENARA CYBERPOT. CIVIL AND FIBER PULLING 372,000.00 KOMASI COMMUNICATIONS SDN BHD / FIBRECOMM NETWORK (M) SDN BHD 2012
104 THE CIVIL WORK AND INSTALLATION FIBRE OPTIC CABLE FROM FIBRECOMM-MAXIS R5 TO TM PUTRAJAYA VIA TM DUCTING CIVIL AND FIBER PULLING 389,037.20 KOMASI COMMUNICATIONS SDN BHD / FIBRECOMM NETWORK (M) SDN BHD 2012
105 NEW CIVIL INFRASTRUCTURE OPTICAL FIBRE CABLE AND ACCESSORIES SEMANTAN (LEVEL 7) –FCN HP TOWER CABIN (ROOFTOP) USING MICRO TRENCHING METHODCIVILAND FIBER PULLING CIVIL AND FIBER PULLING 369,518.00 KOMASI COMMUNICATIONS SDN BHD / FIBRECOMM NETWORK (M) SDN BHD 2012
106 PROPOSED CIVIL, HORIZONTAL DIRECTIONAL DRILLING AND MICRO TRENCHING WORKS FROM NTT CYBERJAYA TO PATIMAS TO MENARA AIK HUA CIVIL, HORIZONTAL DIRECTIONAL DRILLING AND MICRO TRENCHING WORKS 3,139,120.30 KOMASI COMMUNICATIONS SDN BHD / NTT MSC SDN BHD 2012
107 MENSA PROJECT : FTK MAN CIVIL & FIBER INFRASTRUCTURE AT KELANA JAYA CIVIL AND FIBER PULLING 1,547,393.21 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2012
108 - SUPPLY & INSTALL 2 WAY GI PIPE FOR ROAD CROSSING
- SUPPLY & INSTALL 100MM CORRUGATED DUCT
- INSTALL 19 CORE P/S/P CABLE
- INSTALL 2 CORE P/S/P CABLE
- INSTALL CABLE PIT DETECTOR PIT
- INSTALL POLES, ASPECTS AND TRAFFIC LIGHT CONTROLLER
- SUPPLY & INSTALL DETECTOR LOOP SENSOR
- SUPPLY & INSTALL TRAFFIC LIGHT CONTROLLER PLINTH
SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 850,000.00 ITRAMAS TECHNOLOGY SDN BHD / WCT (TRAFFIC SIGNAL SYSTEM FOR MEDINI, BANDAR ISKANDAR, JOHOR) / INTEGRATED DYNASTY (M) SDN BHD 2012
109
  • SUPPLY & INSTALL 100MM CORRUGATED DUCT
  • INSTALL 19 CORE P/S/P CABLE
  • INSTALL 2 CORE P/S/P CABLE
  • INSTALL / REPAIR CABLE PIT
  • SUPPLY & INSTALL DETECTOR LOOP SENSOR
  • INSTALL TRAFFIC LIGHT POLE, ASPECTS C/W TERMINATION
SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 356,500.00 ITRAMAS TECHNOLOGY SDN BHD / WCT (TRAFFIC SIGNAL SYSTEM FOR MEDINI, BANDAR ISKANDAR, JOHOR) / INTEGRATED DYNASTY (M) SDN BHD 2013
110 TRAFFIC LIGHT JUNCTION WORK AT NEGERI SEMBILAN (GEMAS AND GEMENCHEH) SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 90,800.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / INTEGRATED DYNASTY (M) SDN BHD 2013
111 EPCC OF THE NGDS TO PULAU INDAH, FL STAGE 2/12 KLANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 STEEL PIPES - 200M 250,000.00 GAS MALAYSIA BERHAD 2013
112 EPCC OF THE NGDS TO BUKIT RAMBAI, FL STAGE 1/12 BUKIT RAMBAI INDUSTRIAL AREA IV, MELAKA ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES - 700M 489,000.00 GAS MALAYSIA BERHAD 2013
113 RELOCATION OF GAS PIPELINE WORKS RELATED TO THE CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM DATARAN SUNWAY STATION TO SECTION 17 ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 STEEL PIPES RELOCATION WITH 6 NOS OF HOT TAPPING STOPPLES OF 8" X 8" - 3200M 4,200,000.00 MUDAJAYA CORPORATION BERHAD / MRT CORPORATION BHD 2013
114 EPCC OF THE NGDS TO KAPAR MERU FL STAGE 1/12, KAPAR & MERU, KLANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES - 66M 382,350.00 GAS MALAYSIA BERHAD July 2012 to Jan 2013
115 TO CONDUCT DIVING INSPECTION AT JETTY PILES QUAY 2 & 3 MMHE PASIR GUDANG, JOHOR MARINE & SALVAGE WORKS 270,000.00 RNC TECHNOLOGY (M) SDN BHD/EXCALIBER RESOURCES SDN BHD May 2013
116 TO INSTALL ANODES AT TANJUNG LANGSAT JETTY, JOHOR DARUL TAKZIM MARINE & SALVAGE WORKS 325,000.00 SBN INDUSTRIES SDN BHD/EXCALIBER RESOURCES SDN BHD June 2013
117 EPCC OF THE NGDS TO SENAI FL STAGE 1/13, SENAI INDUSTRIAL AREA, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES - 600M 199,998.00 GAS MALAYSIA BERHAD 2013
118 EPCC OF THE NGDS TO KULAI FL STAGE 1/12, JALAN AIR HITAM, KULAIJAYA, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES - 120M 256,265.00 GAS MALAYSIA BERHAD 2013
119 EPCC OF THE NGDS TO CHUPING FL STAGE 1/12, CHUPING,PERLIS INDERA KAYANGAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6, AND NPS 4 STEEL PIPES - 9864M 2,335,700.00 GAS MALAYSIA BERHAD 2013
120 EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/12, TANJUNG LANGSAT, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, AND NPS 4 STEEL PIPES - 900M 435,000.00 GAS MALAYSIA BERHAD 2013
121 EPCC OF THE NGDS TO SEPANG FL STAGE 1/13 (REINFORCEMENT), SALAK TINGGI, SEPANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 STEEL PIPES - 3198M 3,603,188.00 GAS MALAYSIA BERHAD 2013
122 PROJEK MENAIKTARAF LEBUHRAYA JOHOR BAHRU- PASIR GUDANG DARI 4 LORONG KE 6 LORONG, JOHOR (THE''PROJECT") ROAD MAINTENANCE WORKS 555,647.80 KOMASI COMMUNICATIONS SDN BHD / IDX MULTI RESOURCES SDN BHD 2013
123 THE SUPPLY AND THE PROVISION OF ENGINEERING SERVICES OF OPTICAL FIBRE CALBLE INFRASTRUCTURE AND INSTALLATION FOR JOHOR FIBRE ROLL-OUT MENARA ANSAR TO DANGA BAY (8.5 KM) CIVIL AND FIBER PULLING 2,245,568.50 KOMASI COMMUNICATIONS SDN BHD / PUNCAK SEMANGAT SDN BHD 2013
124 THE ROAD NAMELY UTILITY MAPPING , HDD, MILLING & PAVING & PIER CABLE BRIDGE FOR TNB'S CABLE LAYING FROM 33KV PMU TTJ TO TNB SSU AT ON SEMI-SITE 1 CIVIL AND FIBER PULLING 2,820,635.00 KOMASI COMMUNICATIONS SDN BHD / SCG INDUSTRIES MALAYSIA SDN BHD 2013
125 PSND10948: NWK: CIVIL & FIBER FOR MUADZAM SHAH (MAXIS) CIVIL AND FIBER PULLING 499,905.30 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2013
126 PSND10936: NWK: CIVIL & FIBER FOR DIGI SOUTH OF RAUB (AS) CIVIL AND FIBER PULLING 1,463,299.63 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2013
127 PSND10949: NWK: CIVIL & FIBER FOR DIGI DONG , PAHANG CIVIL AND FIBER PULLING 1,914,462.41 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2013
128 SUPPLY AND ENGINEERING WORKS FROM TH PROPERTIES DATA CENTRE TO EXISTING MANHOLE (ROUTE 1 AND ROUTE 2) AT BANDAR ENSTEK CIVIL WORKS 564,304.21 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2013
129 UNDERWATER INSPECTION TO JETTY STRUCTURE AT FELDA SAHABAT, LAHAD DATU, SABAH MARINE & SALVAGE WORKS 185,000.00 3R SYSTEMS SDN BHD/EXCALIBER RESOURCES SDN BHD March 2014
130 UNDERWATER INSPECTION AT BOUSTEAD NAVAL DOCK YARD, LUMUT, PERAK MARINE & SALVAGE WORKS 155,000.00 RNC TECHNOLOGY (M) SDN BHD/EXCALIBER RESOURCES SDN BHD March 2014 to April 2014
131 REHABILITATION OF CATHODIC PROTECTION AT KPC, KUANTAN, PAHANG DARUL MAKMUR MARINE & SALVAGE WORKS 510,000.00 SBN INDUSTRIES (M) SDN BHD/EXCALIBER RESOURCES SDN BHD March 2014 to May 2014
132 INSTALL ANODES (WELDING) AT KBOT JETTY PILES, SANDAKAN, SABAH MARINE & SALVAGE WORKS 280,000.00 SBN INDUSTRIES (M) SDN BHD/EXCALIBER RESOURCES SDN BHD June 2014 to July 2014
133 DIVING SERVICES FOR DEWATERING AT CENDOR MOPU (OFFSHORE) MARINE & SALVAGE WORKS 1,250,000.00 CENDOR MOPU PRODUCER LTD/EXCALIBER RESOURCES SDN BHD October 2014
134 CONDITION ASSESSMENT AND ENGINEERING WORKS AT BOUSTEAD NAVAL DOCKYARD, LUMUT, PERAK MARINE & SALVAGE WORKS 220,000.00 RNC TECHNOLOGY (M) SDN BHD/EXCALIBER RESOURCES SDN BHD Nov 2014 to Dec 2014
135 EPCC OF THE NGDS TO LUMUT FL STAGE 1/13, SITIAWAN, PERAK DARUL RIDZUAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES - 456M 330,000.00 GAS MALAYSIA BERHAD 2014
136 EPCC OF THE NGDS TO KULAI FL STAGE 1/13, KAWASAN PERINDUSTRIAN I-PARK, KULAIJAYA, JOHOR BAHRU, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES - 2388M 1,238,000.00 GAS MALAYSIA BERHAD 2014
137 CADANGAN PEMBANGUNAN KILANG BERKEMBAR 3 ½ TINGKAT JENIS A (6 UNIT), JENIS B (10 UNIT) DAN KILANG SESEBUAH 3 1/2 TINGKAT (1 UNIT) DI ATAS LOT PT 1260 (HSD) 176557, JALAN PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN BROADWAY MERGER SDN BHD SUB-CONTRACT OF GAS PIPE PROTECTION AND MDPE PIPE RELOCATION - 150M 200,000.00 BROADWAY MERGER SDN BHD 2014
138 EPCC OF THE NGDS TO MAK MANDIN & PRAI FL DL STAGE 1/14, MAK MANDIN & PRAI, PULAU PINANG ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 STEEL PIPES - 1380M 1,298,000.00 GAS MALAYSIA BERHAD 2014
139 EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 2/14, TANJUNG LANGSAT, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 STEEL PIPES - 984M 530,000.00 GAS MALAYSIA BERHAD 2014
140 EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/14, TANJUNG LANGSAT, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES - 822M 850,000.00 GAS MALAYSIA BERHAD 2014
141 MENAIKTARAF JALAN MUAR - TANGKAK-SEGAMAT JOHOR (FASA 1: SEGAMAT - TANGKAK) PAKEJ 2 ROAD MAINTENANCE WORKS 4,847,006.50 KOMASI COMMUNICATIONS SDN BHD / BINA MEKAR SDN BHD 2014
142 FULL TURNKEY OF CIVIL AND FIBER INFRASTRUCTURE OF CELCOM PROJECT - PHASE 2 : CELCOM SKUDAI TAMAN UNIVERSITI CIVIL AND FIBER PULLING 234,000.00 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2014
143 MASS RAPID TRANSIT LEMBAH KLANG: JAJARAN SUNGAI BULOH KAJANG PACKAGE V8 : CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER WORKS FROM TAMAN MESRA KAJANG STATION RELOCATION OF EXISTING DIGI & MAXIS SERVICES ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING FOR CIVIL AND FIBER PULLING 237,123.88 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2014
144 SUPPLY AND ES FOR NEW CIVIL INFRASTRUCTURE, OPTICAL FIBRE CABLE AND ACCESSORIES FOR 48 CORES FROM CABIN PMU SKUDAI TO TAMAN SRI SKUDAI CIVIL AND FIBER PULLING 216,608.80 KOMASI COMMUNICATIONS SDN BHD / FIBRECOMM NETWORK (M) SDN BHD 2014
145 CABLE MIGRATION WORKS TO JB SENTRAL CABLE MIGRATION WORKS 278,970.52 KOMASI COMMUNICATIONS SDN BHD /FIBERAIL SDN BHD 2014
146 BUTTERFLY PROJECT AIR HITAM SKUDAI LINK ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 468,538.00 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2014
147 HDD WORKS FOR SITE "JPELFH01" KTMB CROSSING JOHOR BAHRU HORIZONTAL DIRECTIONAL DRILLING WORKS 123,860.97 KOMASI COMMUNICATIONS SDN BHD /FIBERAIL SDN BHD 2014
148 RELOCATION OF MICRO TRENCHING WORKS FROM MH NO 3 (ISTANA HOTEL)TO EXISTING MANHOLE AT MAJU EXPRESSWAY (BULATAN KG PANDAN) CIVIL AND FIBER PULLING 916,280.52 KOMASI COMMUNICATIONS SDN BHD /FIBERAIL SDN BHD 2014
149 CIVIL AND PULLING WORK FOR MALAYSIA MARINE HEAVY ENGINEERING (MMHE)(THE 'WORK) CIVIL AND FIBER PULLING 234,115.00 KOMASI COMMUNICATIONS SDN BHD / TIME DOTCOM BERHAD 2014
150 TRAFFIC LIGHT JUNCTION WORK AT MEDINI JUNCTION, BANDAR ISKANDAR, JOHOR SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 61,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / INTEGRATED DYNASTY (M) SDN BHD 2014
151 TRAFFIC LIGHT JUNCTION WORK AT TAMAN SELASIH, KULIM SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 75,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / INTEGRATED DYNASTY (M) SDN BHD 2014
152 TRAFFIC LIGHT JUNCTION WORK AT LABU, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 43,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / INTEGRATED DYNASTY (M) SDN BHD 2014
153 TRAFFIC LIGHT JUNCTION WORK AT TANJUNG TOKONG, PENANG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 95,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / E & O / INTEGRATED DYNASTY (M) SDN BHD 2014
154 TO RELOCATE TRAFFIC SIGNAL SYSTEM AT CENTRAL MARKET SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 57,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / E & O / INTEGRATED DYNASTY (M) SDN BHD 2014
155 PMU 132KV TASEK GELUGOR SWITCHING STATION 2 X 13KV AIS OHL FEEDER BAYS, 2X 132KV UGC FEEDER BAYS, 1X132 BUS COUPLER BAY, NEW TRANSMISSION RTU, CONTROL & RELAY PANEL, LVAC, GENSET, EARTHING SYSTEMS AND ALL OTHER ASSOCIATE ANCILLARY EQUIPMENT, NEW 132KV BUILDING, ACCESS ROAD AND ASSOCIATED CIVIL WORK , ALL RELATED TESTING &COMMISIONING WORKS BY OEM'S TESTER 505,520.00 TRANSPRO SDN BHD 2014
156 TRAFFIC LIGHT JUNCTION WORK AT JELUTONG EXPRESSWAY, PENANG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 125,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / IJM / INTEGRATED DYNASTY (M) SDN BHD 2014
157 EPCC OF THE NGDS TO BUKIT KEMUNING DL STAGE 1/13 (LOOPING) BUKIT KEMUNING, SHAH ALAM, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF PE 125 MM, PE PIPES - 750M 517,337.50 GAS MALAYSIA BERHAD Aug 2013 to Jan 2014
158 EPCC OF THE NGDS TO SEPANG FL STAGE 3/13, TANJUNG INDUSTRIAL PARK, SEPANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 16, NPS 8 AND NPS 6 STEEL PIPES - 9260M 6,494,600.00 GAS MALAYSIA BERHAD Dec 2013 to Nov 2014
159 TO SUPPLY APC SOLUTIONS FOR JPKN NEW BUILDING DATA CENTER IN KK AND DRC IN TAWAU TO SUPPLY APC SOLUTIONS FOR JPKN NEW BUILDING DATA CENTER IN KK AND DRC IN TAWAU 6,000,000.00 SRI KOMPUTER SDN BHD July 2014 to Jan 2015
160 SUPPLY MANPOWER AND DIVING EQUIPMENT FOR SALVAGE WORK (KD PERANTAU) AT LUMUT PERAK MARINE & SALVAGE WORKS 1,600,000.00 BOUSTEAD NAVAL DOCKYARD/EXCALIBER RESOURCES SDN BHD Dec 2014 to Jan 2015
161 PRESERVATION SERVICES FOR TREATMENT OF WATER DAMAGED MACHINERY OF PARTIALLY SUNKEN KD PERANTAU. CARRY OUT PRESERVATION OF MACHINERY AND EQUIPMENT DAMAGE PREVENTION AND CLEANING AFTER SALVAGE OF KD PERANTAU. 3,100,000.00 BOUSTEAD NAVAL SHIPYARD SDN BHD Dec 2014 Feb 2015
162 SALVAGE OPERATION KD PERANTAU TO CONTINUE AND TAKE OVER SALVAGE OPERATION 1,594,232.50 BOUSTEAD NAVAL SHIPYARD SDN BHD Jan-15
163 EXTENSION - SALVAGE OPERATION KD PERANTAU EXTENSION OF SALVAGE OPERATION KD PERANTAU (UPRIGHT AND REAFLOAT) 2,441,886.00 BOUSTEAD NAVAL SHIPYARD SDN BHD Jan-15
164 NAVAL ARCHITECTURE - SALVAGE KD PERANTAU TO PROVIDE ENGANGE SERVICE OF NAVAL ARCHITECT TO CONDUCT DOCKING ANALYSIS AND SHIP STABILITY ANALYSIS OF KD PERANTAU AND TO PROVIDE FULL ANALYSIS REPORT. 92,400.00 BOUSTEAD NAVAL SHIPYARD SDN BHD Jan-15
165 REPAIR, REHABILITATION AND REVIVAL OF SHIP LIFT PLATFORM AT TLDM LUMUT FOR BOUSTEAD NAVAL SHIPYARD, LUMUT, PERAK D.R MARINE & SALVAGE WORKS 215,000.00 RNC TECHNOLOGY (M) SDN BHD/EXCALIBER RESOURCES SDN BHD Mar 2015 to June 2015
166 TO SUPPLY APC SOLUTIONS FOR MATRADE BUILDING DATA CENTER UPGRADING JOB TO SUPPLY APC SOLUTIONS FOR MATRADE BUILDING DATA CENTER UPGRADING JOB 1,800,000.00 BIT GROUP SDN BHD Mar 2015 to Sept 2015
167 UNDERWATER SALVAGE OF TUG BOAT AT PENANG PORT CONSORTIUM PENANG MARINE & SALVAGE WORKS 250,000.00 EXCALIBER RESOURCES SDN BHD Nov 2015 to Dec 2015
168 UNDERWATER SALVAGE OF TUG BOAT AT PENANG PORT CONSORTIUM PENANG MARINE & SALVAGE WORKS 250,000.00 EXCALIBER RESOURCES SDN BHD Nov 2015 to Dec 2015
169 EPCC OF THE NGDS TO TEBRAU FL STAGE 1/14, TEBRAU, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES -1296M 1,213,852.00 GAS MALAYSIA BERHAD 2015
170 EPCC OF THE NGDS TO WEST PORT FL STAGE 2/14, WEST PORT, KLANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -48M 218,000.00 GAS MALAYSIA BERHAD 2015
171 EPCC OF THE NGDS TO BANTING FL STAGE 1/14, OLAK LEMPIT INDUSTRIAL AREA, BANTING, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 STEEL PIPES 2,460,080.00 GAS MALAYSIA BERHAD 2015
172 EPCC OF THE NGDS TO MERU FL STAGE 3/15, MERU, KLANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES 176,278.00 GAS MALAYSIA BERHAD 2015
173 MSVT-TUKAR KABEL VOLTAN TINGGI 22KV PILC UNTUK TUJUAN PENUKARAN PILC SEDIA ADA SEPANJANG 2KM KAWASAN PASIR GUDANG INDUSTRI FASA 8 (KERJA - KERJA MERENTANG 1 LITAR KABEL 240MMP XLPE 22KV IC BARU ANTARA PE TIONG NAM KE PCOC DAN BYPASS PE KOMERSIAL MINERAL BAGI MENGGANTIKAN KABEL LAMA) -KERJA HDD CIVIL AND FIBER PULLING 197,067.00 KOMASI COMMUNICATIONS SDN BHD / TENAGA NASIONAL BERHAD 2015
174 MSVT-MERENTANG KABEL VOLTAN TINGGI 11KV XLPE UNTUK TUJUAN RE- CONFIGURE SISTEM SEDIADA KAWASAN JOHOR JAYA FASA 10 (MSVT NEW INJECTION MERENTANG 1 LITAR KABEL VOLTAN TINGGI 1C 240MMP 22KV DARI PMU TEBRAU KE TEMPAT CADANGAN POTONG & SAMBUNG KE S/S GIANT SEPANJANG 1746M) (KERJA KONTRAK HDD) CIVIL AND FIBER PULLING 249,294.40 KOMASI COMMUNICATIONS SDN BHD / TENAGA NASIONAL BERHAD 2015
175 RECTIFICATION WORK FOR INTERMARK CABLE AT JUNCTION OF JALAN AMPANG - JALAN TUN RAZAK CIVIL AND FIBER PULLING 102,591.31 KOMASI COMMUNICATIONS SDN BHD / FIBERAIL SDN BHD 2015
176 MSVT- TUKAR KABEL VOLTAN TINGGI 11KV UNTUK TUJUAN RE-CONFIGURE SISTEM SEDIADA DI KAWASAN JOHOR JAYA FASA 8 (MSVT NEW INJECTION 3C 240MMP 11KV PE TMN MOLEK NO 3 KE PE TMN MOLEK NO 14 SEPANJANG 1229 METER ) (KERJA KONTRAK HDD) CIVIL AND FIBER PULLING 103,000.00 KOMASI COMMUNICATIONS SDN BHD / TENAGA NASIONAL BERHAD 2015
177 CONTRACT FOR NETWORK DEVELOPMENT PROJECT VIA SCHEDULE OF RATE (JKH) FOR TELEKOM MALAYSIA BERHAD ™ CIVIL AND FIBER PULLING 34,773,000.00 KOMASI COMMUNICATIONS SDN BHD / TM BERHAD 2015
178 THE SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF THE TELEPHONE INFRASTRUCTURE WORKS FOR TOTAL 80 UNITS OF MIXED RESIDENTIAL UNITS ( STAGE 1-39 UNITS & STAGE 2-41 UNITS) DI ATAS SEBAHAGIAN LOT PTD 104940, INDAHPURA ZONE 33B, MUKIM KULAI, DAERAH KULAIJAYA, NEGERI JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 418,730.00 KOMASI COMMUNICATIONS SDN BHD / GPROPERTY CONSTRUCTION SDN BHD 2015
179 THE SUPPLY, DELIVERY , INSTALLATION , TESTING & COMMISSIONING OF TELEPHONE INFRASTRUCTURE WORKS FOR PROPOSED DEVELOPMENT AT PHASE 1 FOR ECO BUSINESS PARK 1 ON PART OF LOT PTD 117036, 117040 & 117041, MUKIM TEBRAU , DAERAH JOHOR BHARU, JOHOR ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING 819,705.00 KOMASI COMMUNICATIONS SDN BHD / ECO BUSINESS PARK 1 DEVELOPMENT SDN BHD 2015
180 TRAFFIC LIGHT JUNCTION WORK AT NILAI, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 145,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / IJM / INTEGRATED DYNASTY (M) SDN BHD 2015
181 TRAFFIC LIGHT JUNCTION WORK AT LUKUT, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 30,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / INTEGRATED DYNASTY (M) SDN BHD 2015
182 TRAFFIC LIGHT JUNCTION WORK AT KEPONG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 95,000.00 TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN BHD / INTEGRATED DYNASTY (M) SDN BHD 2015
183 LOI FOR P&D : COVERAGE: WISMA UOA DAMANSARA 2 CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 07.07.2015 to 07.07.2015
184 SERVICE ORDER : FIBER PULLING WORK TO MDF ROOM MENARA PNB JALAN TUN RAZAK, KL CIVIL AND FIBER PULLING 2,333.56 TIME DOT COM BERHAD 13.08.2015 to 13.08.2015
185 THE ASCENT @ PARADIGM MALL PETALING JAYA, SELANGOR DARUL EHSAN CIVIL AND FIBER PULLING 1,537.78 TIME DOT COM BERHAD 09.09.2015 TO 09.09.2015
186 RAISE UP MANHOLE – MENARA PNB CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 28.10.2015 TO 28.10.2015
187 LOI FOR P&D : NTT CYBERJAYA CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 2015
188 FIBER PULLING FOR NTT CYBERJAYA CIVIL AND FIBER PULLING 4,348.21 TIME DOT COM BERHAD 15.09.2015 TO 28.09.2015
189 EPCC OF THE NGDS TO LIPAT KAJANG FL STAGE 2/13 AND STAGE 3/13, LIPAT KAJANG INDUSTRIAL AREA, MUKIM JASIN, MELAKA ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 12, NPS 8 AND NPS 6 STEEL PIPES -29262M 9,988,772.00 GAS MALAYSIA BERHAD 2015
190 EPCC OF THE NGDS TO KL FL STAGE 1/15, JALAN PEEL, KUALA LUMPUR ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 STEEL PIPES -1056M 2,731,471.60 GAS MALAYSIA BERHAD 2015
191 EPCC OF GPRW AT JALAN GUDANG, JOHOR PORT INDUSTRIAL AREA, PASIR GUDANG, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 STEEL PIPES - 204M 494,998.80 GAS MALAYSIA BERHAD 2015
192 EPCC OF THE NGDS TO KULAI FL STAGE 1/15, KULAIJAYA, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES -1506M 868,924.40 GAS MALAYSIA BERHAD 2016
193 COVERAGE : PROPOSED CIVIL & FIBER PULLING 48 FROM BANGSAR HEIGHT TOWER TO TIME EXISTING M/H CIVIL AND FIBER PULLING 26,624.18 TIME DOT COM BERHAD 2016
194 COVERAGE : PROPOSED CIVIL & FIBER PULLING FROM PURI AYU CONDO TO TIME EXISTING M/H CIVIL AND FIBER PULLING 49,425.24 TIME DOT COM BERHAD 2016
195 EPCC OF NGDS TO PEGOH FL STAGE 2/15, HICOM INDUSTRIAL PARK PEGOH, ALOR GAJAH, MELAKA (HONDA MALAYSIA SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 & NPS 6 1,898,000.00 GAS MALAYSIA BERHAD 2016
196 TO DESIGN AND BUILD TRAFFIC LIGHT SIGNALLING JUNCTION AT MACHANG BUBUK, PENANG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 212,265.00 TF LAND SDN BHD / INTEGRATED DYNASTY (M) SDN BHD 2016
197 TO RELOCATE EXISTING TRAFFIC LIGHTS JUNCTION @ MEDINI, JOHOR SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 109,230.00 NURI MERDU SDN BHD / INTEGRATED DYNASTY (M) SDN BHD 2016
198 SALVAGE WORKS AT PENANG PORT SDN BHD MARINE & SALVAGE WORKS 670,000.00 EXCALIBER RESOURCES SDN BHD Feb 2016 to March 2016
199 PROPOSED CONTAINER TERMINAL ASSOCIATED INFRASTRUCTURE WORKS AT POIC, LAHAD DATU, SABAH MARINE & SALVAGE WORKS 250,000.00 SCORR TECHNOLOGY SDN BHD/EXCALIBER RESOURCES SDN BHD March 2016 to May 2016
200 COVERAGE : CIVIL AND FIBER PULLING AT BUKIT PANDAN 1 CIVIL AND FIBER PULLING 25,440.00 TIME DOT COM BERHAD 2016
201 SUASANA BUKIT CEYLON - CIVIL (60MTR) AND PULLING (200MTR) FOR SUASANA BUKIT CEYLON AT PERSIARAN RAJA CHULAN, KUALA LUMPUR CIVIL AND FIBER PULLING 19,480.40 TIME DOT COM BERHAD 2016
202 SO DRIVEN (DIGI) : OVERHEAD INFRA (2000M) AND FIBER PULLING (2300M) FOR DIGI DONG RESILIENCY TOWN AREA CIVIL AND FIBER PULLING 46,662.37 TIME DOT COM BERHAD 2016
203 CIVIL AND FIBER PULLING AT MAXIS KUANTAN CIVIL AND FIBER PULLING 163,800.00 TIME DOT COM BERHAD 2016
204 SO : FIBER INFRA WORKS AT CELCOM SITE - JALAN KIA PENG, KUALA LUMPUR CIVIL AND FIBER PULLING 38,941.78 TIME DOT COM BERHAD 2016
205 SO : CIVIL AND FIBER PULLING AT SUCCESS ELECTRONIC CIVIL AND FIBER PULLING 17,713.46 TIME DOT COM BERHAD 2016
206 SO : CIVIL AND FIBER FOR VISI CENDERAWASIH @ PTTC IPOH, PERAK CIVIL AND FIBER PULLING 33,541.49 TIME DOT COM BERHAD 2016
207 FTK FOR PROPOSED NEW INFRASTRUCTURE OF CIVIL AND FIBER PULLING FROM JALAN TAMAN BUKIT MALURI TO KIARA 5 CIVIL AND FIBER PULLING 209,880.00 TIME DOT COM BERHAD 2017
208 PROPOSED FIBER INFRASTRUCTURE WORK AT SOUTHVIEW SERVICES APARTMENT BANGSAR, KUALA LUMPUR CIVIL AND FIBER PULLING 77,829.52 TIME DOT COM BERHAD 2017
209 SO : PROPOSED NEW FIBER INFRA TO GRAND WEIL HOTEL, JALAN SULTAN IDRIS, IPOH, PERAK CIVIL AND FIBER PULLING 105,292.10 TIME DOT COM BERHAD 2017
210 PMU 132KV BUKIT TENGAH REHAB (STAGE 3 ), PULAU PINANG INSTALLATION OF 132KV SUBSTATION INCLUDING CABLING, TESTING & COMMISIONING 1,100,000.00 PEMBINAAN TERAS MAJU SDN BHD 2017
211 2W CIVIL AND 48F PULLING WORK FOR MAISSON ARA DAMANSARA TO EXISTING TIME M/HOLE CIVIL AND FIBER PULLING 176,893.85 TIME DOT COM BERHAD 2017
212 PROJEK MASS RAPID TRANSIT LEMBAH KELANG JAJARAN SUNGAI BULOH - KAJANG PACKAGE V3 : CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM DATARAN SUNWAY STATION TO SECTION 17 SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 1,283,310.20 MUDAJAYA CORPORATION BERHAD 2017
213 EPCC OF NGDS TO PULAU INDAH FL STAGE 1/16, SELANGOR HALAL HUB, PULAU INDAH, SELANGOR DARUL EHSAN (LONGSON FOOD PRODUCTS SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 AND NPS 4 STEEL PIPES - 324M 485,290.00 GAS MALAYSIA BERHAD 2017
214 EPCC OF NGDS TO SENDAYAN FL STAGE 2/16, SENDAYAN TECH VALLEY, SEREMBAN 2, NEGERI SEMBILAN DARUL KHUSUS (VIO STAR INTERNATIONAL (M) SDN BHD AND DAIHATSU ENGINE MANUFACTURING SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL PIPES -1290M 662,700.00 GAS MALAYSIA BERHAD 2017
215 EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/16, TANJUNG LANGSAT, JOHOR DARUL TAKZIM (KIRAN GLOBAL ALKALI SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 STEEL PIPES -1688M 692,700.00 GAS MALAYSIA BERHAD 2017
216 EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 4/16, TANJUNG LANGSAT, JOHOR DARUL TAKZIM (POLYNT COMPOSITE MALAYSIA SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 AND NPS 4 STEEL PIPES -264M 228,600.00 GAS MALAYSIA BERHAD 2017
217 EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 5/16, TANJUNG LANGSAT, JOHOR DARUL TAKZIM (NORMAN PROCESS OILS MALAYSIA PLANT SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -60M 223,900.00 GAS MALAYSIA BERHAD 2017
218 PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) UNDERGROUND WORKS PACKAGE: DESIGN, CONSTRUCTION AND COMPLETION OF TUNNELS, STATION AND ASSOCIATED STRUCTURES FROM JALAN IPOH NORTH ESCAPE SHAFT TO DESA WATERPARK SOUTH PORTAL END CAPPING WORK AT PETRONAS KG. BARU 58,000.00 MMC GAMUDA KVMRT (T) SDN BHD 2017
219 EPCC OF THE NGDS TO KAPAR FL STAGE 5/16, KAPAR, KLANG, SELANGOR DARUL EHSAN (SUNWAY VCP SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -48M 289,000.00 GAS MALAYSIA BERHAD 2017
220 EPCC OF THE NGDS TO MERU FL STAGE 2/16, KLANG, SELANGOR DARUL EHSAN (IDEAL QUALITY SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -36M 250,000.00 GAS MALAYSIA BERHAD 2017
221 EPCC OF THE NGDS TO PASIR GUDANG FL STAGE 3/16, PASIR GUDANG, JOHOR DARUL TAKZIM (ALMER MALAYSIA SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -60M 298,000.00 GAS MALAYSIA BERHAD 2017
222 EPCC OF THE NGDS TO YONG PENG FL STAGE 1/17, YONG PENG, JOHOR DARUL TAKZIM (TEO SENG FEEDMILLS SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -84M 268,000.00 GAS MALAYSIA BERHAD 2017
223 FULL TURNKEY FOR PROPOSED NEW INFRASTRUCTURE OF CIVIL AND FIBER PULLING FROM JALAN TAMAN BUKIT MALURI TO KIARA 5 CIVIL AND FIBER PULLING 2,099,880.00 TIME DOT COM BERHAD 2017
224 FULL TURNKEY TO BUILD CIVIL AND FIBER INFRASTRUCTURE WORK AT SRI KEMBANGAN CIVIL AND FIBER PULLING 495,180.00 TIME DOT COM BERHAD 2017
225 FULL TURNKEY TO BUILD CIVIL AND FIBER INFRASTRUCTURE WORK FOR DESA PARK CITY MAN PROJECT CIVIL AND FIBER PULLING 282,108.92 TIME DOT COM BERHAD 2017
226 COVERAGE: AS-BUILD : FIBER AND CIVIL INFRASTRUCTURE WORK FOR KIPARK MAN CIVIL AND FIBER PULLING 171,592.80 TIME DOT COM BERHAD 2017
227 SO DRIVEN (DIGI): OVERHEAD INFRA AND FIBER PULLING FOR DIGI DONG RESILIENCY TOWN AREA CIVIL AND FIBER PULLING 56,474.02 TIME DOT COM BERHAD 2017
228 SERVICE ORDER: PROPOSED FIBER INFRASTRUCTURE FOR TNB PMU PROJECT RAUB SITE-PERMANENT SOLUTION CIVIL AND FIBER PULLING 98,985.61 TIME DOT COM BERHAD 2017
229 SERVICE ORDER: PROPOSED FIBER INFRASTRUCTURE WORK AT TNB PMU BENTONG, PAHANG CIVIL AND FIBER PULLING 54,504.59 TIME DOT COM BERHAD 2017
230 EPCC OF NGDS TO BUKIT RAJA FL STAGE 1/16, BUKIT RAJA PRIME INDUSTRIAL PARK KLANG. ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -36M 240,000.00 GAS MALAYSIA BERHAD 2017
231 EPCC OF NGDS TO SITIAWAN FL STAGE 1/16, KAMPUNG ACHEH INDUSTRIAL ESTATE, SITIAWAN, PERAK. ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 - 192M, NPS 6 - 408M AND NPS 4 - 48M STEEL PIPES 428,000.00 GAS MALAYSIA BERHAD 2017
232 EPCC OF NGDS TO GEBENG FL STAGE 2/17 GEBENG INDUSTRIAL AREA, KUANTAN, PAHANG DARUL MAKMUR. ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 12 - 300M, NPS 8 - 2,688M AND NPS 6 - 12M STEEL PIPES 1,830,000.00 GAS MALAYSIA BERHAD 2017
233 KERJA- KERJA PMU 132/33KV BERANANG ICT (2x90MVA) SELANGOR TO SUPPLY, DELIVER, INSTALL, TEST AND COMMISIONNING 201,135.00 PEMBINAAN TERASMAJU SDN BHD 2017
234 KERJA- KERJA PMU 132/33KV NEW TELUK INTAN PERAK TO SUPPLY, DELIVER, INSTALL, TEST AND COMMISIONNING 420,555.00 PEMBINAAN TERASMAJU SDN BHD 2017
235 SUPPLY AND DELIVERY OF SHUNT CAPACITOR BANK DAMPING REACTOR TO ASSET MAINTENANCE DEPARTMENT, TNB TRANSMISSIO AS STRATEGIC SPARES SUPPLY OF THREE (3) UNITS OF 132kV 30MVAR SHUNT CAPACITOR BANK DAMPING REACTOR (0.5%) , THREE UNITS OF 132kV 30MVAR SHUNT CAPACITOR BANK DAMPING REACTOR (6.0%), THREE (3) UNITS OF 132kV 60 MVAR SHUNT CAPACITOR BANK DAMPING REACTOR (0.5%), THREE (3) UNITS OF 132kV 60MVAR SHUNT CAPACITOR DAMPING REACTOR (6.0%) TO ASSET MAINTENANCE DEPARTMENT, TNB TRANSMISSION AS STRATEGIC SPARES 1,220,000.00 TRANSPRO SDN BHD 2017
236 SUPPLY OF 275kV SURGE ARRESTER FOR ASSET MAINTENANCE, TRANSMISSION DIVISION, TNB SUPPLY AND DELIVERY OF 90 UNITS 275kV SURGE ARRESTER 910,000.00 TRANSPRO SDN BHD 2017
237 EPCC OF NGDS TO KAMUNTING FL STAGE 2/17, TAIPING, PERAK DARUL RIDZUAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 - 240M, NPS 6 - 24M STEEL PIPES 347,000.00 GAS MALAYSIA BERHAD 2018
238 EPCC OF NGDS TO PULAU INDAH FL STAGE 3/17, PULAUN INDAH INDUSTRIAL PARK (PHASE 2A), KLANG, SELANGOR DARUL EHSAN. ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 8 - 228M, NPS 4 - 24M STEEL PIPES 286,000.00 GAS MALAYSIA BERHAD 2018
239 KERJA- KERJA PMU 132/33KV BATU RAKIT EXTENSION (1x45MVA) TO SUPPLY, DELIVER, INSTALL, TEST AND COMMISIONNING 182,850.00 PEMBINAAN TERASMAJU SDN BHD 2018
240 EPCC OF NGDS TO SENAWANG FL STAGE 1/17, SENAWANG INDUSTRIAL AREA, SENAWANG, NEGERI SEMBILAN DARUL KHUSUS. ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 - 24M STEEL PIPES 239,000.00 GAS MALAYSIA BERHAD 2018
241 EPCC OF NGDS TO BUKIT RAJA FL STAGE 1/17, BUKIT RAJA PRIME INDUSTRIAL PARK, BUKIT RAJA, SELANGOR DARUL EHSAN. ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 - 504M,NPS 4 - 36M STEEL PIPES 319,500.00 GAS MALAYSIA BERHAD 2018
242 CIVIL AND PULLING FOR UMOBILE HUTAN MELINTANG (MELI), TAMAN DESA MELINTANG BARU FASA LI, PERAK CIVIL AND FIBER PULLING 29,518.08 TIME DOT COM BERHAD 2018
243 CIVIL AND PULLING FOR UMOBILEPULAU JUAR, PERAK CIVIL AND FIBER PULLING 13,713.82 TIME DOT COM BERHAD 2018
244 CIVIL AND PULLING FOR UMOBILE SLIM RIVER EXIT (PBNS) CIVIL AND FIBER PULLING 170,053.25 TIME DOT COM BERHAD 2018
245 CIVIL AND PULLING FOR UMOBILE KOTA SETIA (KTST)) CIVIL AND FIBER PULLING 81,911.31 TIME DOT COM BERHAD 2018
246 CIVIL AND PULLING FOR UMOBILE KEM PLKN SUNGKAI (KPSK) SUNGKAI, PERAK. CIVIL AND FIBER PULLING 33,829.74 TIME DOT COM BERHAD 2018
247 FIBER PULLING (550M) FOR ATELIER CONSTRUCTION SDN BHD AT SHELL STATION, HENTIAN RTC GOPENG MUKIM SIMPANG PULAI, PERAK CIVIL AND FIBER PULLING

13,148.17

TIME DOT COM BERHAD 2019
248 FIBER PULLING (260M) FOR ATELIER CONSTRUCTION SDN BHD AT SHELL STATION, HENTIAN ALOR PONGSU PERAK. CIVIL AND FIBER PULLING

10,277.17

TIME DOT COM BERHAD 2019
249 (BBB 90964) CADANGAN MSVT BAGI MENGATASI ISU FEEDER PANJANG & NTL ELEMENT PADA PMU SSWW (F05) SEBANYAK 0.6mw (PMU SSW 11kV, TNB BANGI) TO LAY 2 WAY AND 3 WAY 160MM HDPE PN10 BY HDD METHOD

700,000.00

MUTU NUSANTARA / TNB 2019
250 INSTALLATION, TESTING AND COMMISIONING OF 33KV ALUMINIUM XLPE SINGLE CORE UNDERGROUND CABLES, UNDERGROUND AND ACCESSORIES FROM PMU KOTA DAMANSARA TO PPU TROPICANA 2 FOR TNB DISTRIBUTION SELANGOR TO SUPPLY HDD MACHINE, PILOTING, REAMING AND PULLING 4 WAY HDPE 6" AND WAY 4" 1,200,000.00 MUTU NUSANTARA / TNB 2019
251 KERJA-KERJA MEMBAIKPULIH, MENGUJI DAN MEMULATUGAS PENGECAS MODEL 110 TPR 50 BUATAN SAFT NIFE DI PENCAWANG MASUK UTAMA BATU GAJAH (BGJH) 275kV DIBAWAH JAGAAN UNIT PERLINDUNGAN DAN AUTOMASI JABATAN SENGARAAN GRID UTARA (SUBZONE - IPOH) REFURBISH CHARGER 55,000.00 TENAGA NASIONAL BERHAD 2019
252 PEMBEKALAN PERALATAN PENCAWANG DI PMU 75/132KV NATIONAL UNIVERSITY (NUNI) DAN PMU 275KV SERDANG (SRDG) MATERIAL SUPPLY 128,220.00 TENAGA NASIONAL BERHAD 2019
253 KERJA-KERJA MEMBAIKPULIH, MENGUJI DAN MEMULATUGAS PENGECAS BATERI BANK DI PENCAWANG MASUK UTAMA BINTANG (BTNG) 132kV DIBAWAH JAGAAN UNIT PERLINDUNGAN DAN AUTOMASI JABATAN SENGARAAN GRID UTARA (SUBZONE - IPOH) REFURBISH DC CHARGER 48,000.00 TENAGA NASIONAL BERHAD 2019
254 KERJA- KERJA PMU 132/33KV BERANANG ICT (2x90MVA) SELANGOR TO SUPPLY, DELIVER, INSTALL, TEST AND COMMISIONNING 201,135.00 PEMBINAAN TERASMAJU SDN BHD 2019
255 MENAIKTARAF LALUAN FT60 DARI DAMAR LAUT KE CHANGKAT JERING (PAKAEJ 2A), PERAK CIVIL AND FIBER PULLING 220,682.37 TUMPUAN BINA SDN BHD 2019
256 DISTRIBUTION CABLE (D/SIDE) FROM FXC OUTDOOR CABINET TO OUTDOOR PEDESTAL TROPICANA AMAN CHERIA, SLEANGOR. CIVIL AND FIBER PULLING

148,000.00

TIME DOT COM BERHAD 2019
257 MENAIKTARAF LALUAN FT60 DARI DAMAR LAUT KE CHANGKAT JERING (PAKEJ 1: CH0-CH10400) CIVIL AND FIBER PULLING 340,579.97 MEGA SASA SDN BHD 2017/ONGOING
258 MEREKA BENTUK DAN MEMBANGUN INFRASTRUKTUR PUSAT DATA SERTA MEMBEKAL, MEMASANG, MENGUJI, MENTAULIAH DAN MENYELENGGARA PERALATAN INFRASTRUKTUR PUSAT DATA DI BANGUNAN BUSINESS CENTRE II, KULIM HI-TECH PARK, KEDAH MEREKA BENTUK DAN MEMBANGUN INFRASTRUKTUR PUSAT DATA 44,838,000.00 UNIT PEMODENAN TADBIRAN DAN PERANCANGAN PENGURUSAN MALAYSIA (MAMPU), JABATAN PERDANA MENTERI 2018 /ONGOING (MAINTENANCE UP TO 2020)
259 FULL TURNKEY FOR UNDERGROUND CIVIL & FIBRE INFRASTRUCTURE WORK FROM BUKIT KERAYONG TO SIMPANG ASSAM JAWA CIVIL AND FIBER PULLING

2,330,000.00

TIME DOT COM BERHAD 2019/ONGOING
260 FULLY TURNKEY FOR NEW CIVIL & FIBER INFRASTRUCTURE FOR RAWANG MAN PH3 AND PANGSAURI SERI CEMPAKA (USP CLAWBACK PROJECT 2017) CIVIL AND FIBER PULLING 1,052,000.00 TIME DOT COM BERHAD 2019/ONGOING
261 PROJECT MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH-SERDANG-PUTRAJAYA (SPP) REINSTATEMENT OF GAS PIPELINES FOR KAMPUNG BARU NORTH STATION REINSTATEMENT OF GAS PIPELINES 1,898,000.00 MMC GAMUDA KVMRT (T) SDN BHD 2019/ONGOING
262 NEW FIBER PULLING AT PLUS HIGHWAY (AYER KEROH TO SEREMBAN) 1. AYER KEROH - PEDAS LINGGI (MULTIPLE LOCATIONS) 2.PEDAS LINGGI - SENAWANG (END TO END) FIBER PULLING 245,000.00 TIME DOT COM BERHAD 2019/ONGOING
263 ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NATURAL GAS DISTRIBUTION SYSTEM TO BANDAR SULTAN SULAIMAN FL STAGE 1/20, BANDAR SULTAN SULAIMAN INDUSTRIAL AREA, KLANG SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 STEEL PIPES - 396M AND NPS 4 STEEL PIPES - 24M 297,500.00 GAS MALAYSIA BERHAD 2019/ONGOING
264 EPCC OF NGDS TO NILAI DL STAGE 1/20, NILAI INDUSTRIAL AREA, NILAI, NEGERI SEMBILAN DARUL KHUSUS ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -80M PE 63MM 137,500.00 GAS MALAYSIA BERHAD 2020/ONGOING
265 EPCC OF NGDS TO TONGKANG PECHAH FL STAGE 1/20, TONGKANG PECHAH INDUSTRIAL ESTATE JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -12M AND NPS 6 STEEL PIPES 228M 277,500.00 GAS MALAYSIA BERHAD 2020/ONGOING
266 EPCC OF NGDS TO TANGJUNG LANGSAT FL STAGE 2/20, TANJUNG LANGSAT INDUSTRIAL COMPLEX, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES 84M 137,000.00 GAS MALAYSIA BERHAD 2020/ONGOING
267 MANAGE SERVICES (IT OUTSOURCING) IT OUTSOURCING FOR TOUCH 'N GO SDN BHD 2,247,000.00 TOUCH 'N GO SDN BHD 2019/SHORTLISTED, PENDING BOARD COMMITTEE FOR AWARD
268 MEREKABENTUK, MEMBANGUN, MEMBEKAL, MEMASANG, MENGKONFIGURASI, MENGUJI DAN MENTAULIAH PUSAT DATA BERSEPADU KEMENTERIAN PERTAHANAN ICT AND MAINTENANCE FOR MINDEF 37,800,000.00 KEMENTERIAN PERTAHANAN MALAYSIA 2019/SHORTLISTED,P ENDING BOARD COMMITTEE FOR AWARD
269 MEREKA BENTUK , MEMBEKAL, MENGHANTAR, MEMASANG, MENGKONFIGURASI, MENGUJI DAN MENTAULIAH PUSAT DATA MELIBATKAN SISTEM RANGKAIAN SERTA KESELAMATAN, PERALATAN DAN PERISIAN TEKNOLOGI MAKLUMAT DAN KOMUNIKASI (ICT) SERTA KHIDMAT SOKONGAN BAGI PENGGANTIAN PERALATAN ICT DAN PUSAT PEMULIHAN BENCANA (DRC) APLIKASI KRITIKAL AGENSI ICT FOR MAMPU CLOUD 41,300,000.13 UNIT PERMODENAN TADBIRAN DAN PERANCANGAN PENGURUSAN MALAYSIA (MAMPU) 2019/SHORTLISTED,P ENDING BOARD COMMITTEE FOR AWARD
270 CONTRACT FOR THE SUPPLY AND DELIVERY OF 3 LAYER PE COATED (3 LPE) STEEL LINE PIPE TO GMB SUPPLY AND DELIVERY OF 3 LAYER PE COATED (3 LPE) STEEL LINE PIPE TO GMB 42,000,000.00 GAS MALAYSIA BERHAD 2019/PRE- QUALIFICATION STAGE
271 CONTRCT FOR ENTENDED UNINTERRUPTABLE POWER SUPPLY (UPS) AND IMPLEMENTATION OF SMART RACK SOLUTION FOR GAS MALAYSIA EXTENDED UPS AND SUPPLY SMART RACK 1,229,430.40 GAS MALAYSIA BERHAD 2019/TENDERING STAGE
272 EPCC OF NGDS TO ENSTEK FL STAGE 1/20, TECHPARK 2 @ ENSTEK, NEGERI SEMBILAN DARUL KHUSUS ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES - 132M AND NPS 6 STEEL PIPES- 324M 406,440.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
273 EPCC OF NGDS TO PASIR GUDANG FL STAGE 1/20, PASIR GUDANG INDUSTRIAL AREA, PASIR GUDANG JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -12M 296,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
274 EPCC OF NGDS TO KLUANG FL STAGE 2/17 (REINFORCEMENT), KLUANG, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 12 - 15,480M, NPS 8 - 24M, NPS 6 - 60M STEEL PIPES 8,298,000.00 GAS MALAYSIA BERHAD 2018/ONGOING
275 EPCC OF NGDS TO BESTARI JAYA FL STAGE 1/17 (REINFORCEMENT), BESTARI JAYA, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 16 - 8,400M, NPS 8 - 240M STEEL PIPES 4,470,000.00 GAS MALAYSIA BERHAD 2018/ONGOING
276 DESIGN, SUPPLY, INSTALL, TESTING, COMMISSIONING AND IMPLEMENTATION OF AIRPORT COLLABORATIVE DECISION MAKING (A-CDM) INCLUDING COMPREHENSIVE MAINTENANCE FOR MALAYSIA AIRPORTS (SEPANG) SDN. BHD. DESIGN, SUPPLY, INSTALL, TESTING, COMMISSIONING AND IMPLEMENTATION 20,600,000.00 MALAYSIA AIRPORTS (SEPANG) SDN BHD 2020/SHORTLISTED, PENDING BOARD COMMITTEE FOR AWARD
277 PERLUASAN DAN PENGUKUHAN PERKHIDMATAN PDSA FASA II: PEROLEHAN PERKHIDMATAN PEMBANGUNAN INFRASTRUKTUR PUSAT DATA MYGOVCLOUD@PDSA SENTRAL DI ARAS B1, BLOK D6, KOMPLEKS D, PUTRAJAYA MEMBANGUN INFRASTRUKTUR PUSAT DATA TBA UNIT PERMODENAN TADBIRAN DAN PERANCANGAN PENGURUSAN MALAYSIA (MAMPU) 2020/TENDERING STAGE
278 PERLUASAN DAN PENGUKUHAN PERKHIDMATAN PDSA FASA II: PEROLEHAN PERKHIDMATAN PEMBANGUNAN INFRASTRUKTUR PUSAT DATA MYGOVCLOUD@PDSA SENTRAL DI ARAS B1, BLOK D6, KOMPLEKS D, PUTRAJAYA MAINTENANCE ICT & INFRA TBA UNIT PERMODENAN TADBIRAN DAN PERANCANGAN PENGURUSAN MALAYSIA (MAMPU) 2020/TENDERING STAGE
279 PROPOSED WATERPROOFING REPAIR WORKS FOR PMU SUBANG JAYA TOWN CENTRE (SJTC) AND PUCHONG PERDANA (PCHP) FOR GRID MAINTENANCE DEPARTMENT (SELANGOR), GRID DIVISION, TNB REPAIR WORKS 787,155.00 TENAGA NASIONAL BERHAD 2020/TENDERING STAGE
280 EPCC OF NGDS TO AYER KEROH FL STAGE 1/20, AYER KEROH INDUSTRIAL AREA, MELAKA (GLOVETECH INDUSTRIES MALAYSIA SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -18M 292,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
281 EPCC OF NGDS TO PASIR GUDANG INDUSTRIAL AREA PASIR GUDANG, JOHOR DARUL TAKZIM (CCM CHEMICALS SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -72M 320,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
282 EPCC OF NGDS TO PULAU INDAH FL STAGE 4/20, PULAU INDAH INDUSTRIAL AREA, KLANG, SELANGOR DARUL EHSAN (WILMAR PALM PRODUCTS SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL & NPS 8PIPES -252M 243,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
283 EPCC OF NGDS TO BANTING FL STAGE 1/20, OLAK LEMPIT INDUSTRIAL AREA, BANTING, SELANGOR DARUL EHSAN (MIRAGE ALUMINIUM SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -168M 225,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
284 EPCC NGDS TO ENSTEK FL STAGE 2/20, TECHPARK 1 @ ENSTEK, NEGERI SEMBILAN DARUL KHUSUS (ONCOGEN PHARMA MALAYSIA (M) SDN BHD ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -60M 312,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
285 EPCC OF NGDS TO BUKIT SELAMBAU FL STAGE 1/20, BUKIT SELAMBAU INDUSTRIAL AREA, SUNGAI PETANI, KEDAH DARUL AMAN (MUN ZING MALAYSIA SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -24M 230,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
286 EPCC OF NGDS TO SHAH ALAM FL STAGE 2/20, SHAH ALAM, SELANGOR DARUL EHSAN (ANCOM CROP CARE SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -36M 478,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
287 EPCC OF NGDS TO KUALA LUMPUR FL STAGE 1/20, KUALA LUMPUR CITY CENTER, KUALA LUMPUR (BUKIT BINTANG COMMERCIAL CENTER) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 & NPS 6 STEEL PIPES -264M 789,700.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
288 EPCC OF NGDS TO NORTHPORT FL STAGE 1/20, NORTHPORT,SELANGOR DARUL EHSAN (ANCOM CROP CARE SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 STEEL PIPES -552M, NPS 4 STEEL PIPE 24M 368,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
289 EPCC OF NGDS TO SENAI FL STAGE 4/20 I-PARK INDUSTRIAL PARK SENAI AIRPORT CITY SENAI, JOHOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPE 36M 259,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
290 EPCC OF NGDS TO SHAH ALAM FL STAGE 3/20, SHAH ALAM SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 6 STEEL PIPE 816M & NPS 4 STEEL PIPE 48M 620,000.00 GAS MALAYSIA BERHAD 2020/TENDERING STAGE
291 NGDS TO BANDAR SULTAN SULAIMAN FL STAGE 1/20, BANDAR SULTAN SULAIMAN INDUSTRIAL AREA, KLANG, SEALNGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION DAN COMMISSIONING 562,310.00 GAS MALAYSIA DISTRIBUTION SDN BHD 2020/TENDERING STAGE
292 NGDS TO SENDAYAN FL STAGE 1/20, SENDAYAN TECH VALLEY INDUSTRIAL PARK, SENDAYAN, NEGERI SEMBILAN DARUL KHUSUS ENGINEERING, PROCUREMENT, CONSTRUCTION DAN COMMISSIONING 332,000.00 GAS MALAYSIA DISTRIBUTION SDN BHD 2020/TENDERING STAGE
293 NGDS TO TAMPOI FL STAGE 1/20, TAMPOI JAYA INDUSTRIAL PARK, JOHOR BHARU, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION DAN COMMISSIONING 1,027,000.00 GAS MALAYSIA DISTRIBUTION SDN BHD 2020/TENDERING STAGE
294 NGDS TO TEBRAU FL STAGE 1/20, TEBRAU 2 INDUSTRIAL PARK, JOHOR BHARU, JOHOR DARUL TAKZIM ENGINEERING, PROCUREMENT, CONSTRUCTION DAN COMMISSIONING 610,000.00 GAS MALAYSIA DISTRIBUTION SDN BHD 2020/TENDERING STAGE
295 CONTRACT FOR CERTIFIED NETWORK CONTRACTOR FOR NETWORK DEVELOPMENT & MAINTENANCE FOR TELEKOM MALAYSIA BERHAD (“TM”) MAINTENANCE FIBER OPTIC 1,000,000.00 TELEKOM MALAYSIA 2020/ONGOING
296

1. PERKHIDMATAN PENYELENGGARAAN DAN KHIDMAT SOKONGAN BAGI SISTEM eKUTIPAN

2. MENAIKTARAF, MENGINTEGRASI, MENAMBAH BAIK DAN MENGUJILARI SISTEM eKUTIPAN (DALAM TEMPOH JAMINAN SATU (1) TAHUN)

MENAIKTARAF, MENGINTEGRASI, MENAMBAH BAIK DAN MENGUJILARI 130,200.00 MAJLIS BANDARAYA SEREMBAN 2020/ONGOING
297 PERKHIDMATAN PEMBANGUNAN REKABENTUK PROTOTAIP PERANTI PINTAR (ALIRAN DAN ARAS AIR HUJAN) DAN APLIKASI PEMANTAUAN REAL TIME AIR HUJAN BAGI KAJIAN PENJIMATAN AIR SISTEM PENUAIAN AIR HUJAN (SPAH) PERKHIDMATAN PEMBANGUNAN REKABENTUK 142,050.00 BANGUNAN PENTADBIRAN INSTITUT PENYELIDIKANHIDRAULIK KEBANGSAAN MALAYSIA (NAHRIM) 2020/ONGOING
298 TNB470/2020: PROPOSED 132kV DC UGC from PMU CYBERJAYA CENTRAL TO PMU HANWHA Q CELLS HORIZONTAL DIRECTIONAL DRILLING WORKS 1,000,000.00 TENAGA NASIONAL BERHAD 2020/ONGOING
299 EPCC OF NGDS TO PANDAMARAN FL STAGE 1/20, PKNS INDUSTRIAL AREA, KLANG, SELANGOR DARUL EHSAN. (MEJIN OIL SDN BHD) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NPS 4 STEEL PIPES -12M 153,000.00 GAS MALAYSIA BERHAD 2020/ONGOING